Internal · planning

Operating budget

Internal estimate of what the organisation needs to spend each year, with the assumptions and uncertainties listed. The funder document and the interactive planner are separate. Funding plan: an initial seed of £15–50k covers January to April 2027; the main £250k seed is intended to be in place from September 2027 (a target, not yet secured); the CIC is planned to be self-sustaining from late 2028.


Summary

Main seed (Phase One)
£250,000
One-off; target from September 2027, not yet secured. Covers Year 1 and funds the support reserve.
Year 1 operating
~£125,000
Three directors part-time, a small amount of associate work, low overheads.
Reserve fund
~£100,000
Funds support for existing clients when operating income cannot cover it.
Setup & contingency
~£25,000
Capital, certifications, formation, contingency.
Steady-state operating
£385–505k / year
Three directors full-time plus a flexed associate base.
Steady-state revenue need
£480–630k / year
Cost-plus billing covers operating cost and replenishes the reserve.

Year 1: Phase One operating breakdown

Phase One assumes the three directors work part-time during the year, averaging about 50% of full-time between them, and move towards full-time as project revenue comes in. Associates are engaged per project and are not employees. Premises are a single room or small office. The figures cover setting up and running the organisation without drawing on the reserve.

LineAnnualNotes
Three directors at part-time (Phase One average)£75,000~50% FTE across the trio. Year-1 weighted toward client-manager and security/technical lead.
Associate engagements£20,000Per-project specialists across the year.
Premises — modest operational base£6,000Single room or small office; no prestige lease.
Insurance — PI, public liability, employer’s£6,000Cover levels set for Phase One project values.
Tooling, software, hosting, infrastructure£6,000Agentic development tool subscriptions, version control, monitoring, dev/test infra.
Accountancy, legal, CIC reporting£6,000Year-1 annual return, audit-ready accounts.
Business development — travel, events, intake£3,000Kept low; business development is limited to travel, events and intake.
Cyber Essentials Plus (annual recert)£3,000Renewed annually from the start.
Total Year 1 operating£125,000Funded from the seed.

Capital and one-off setup: Year 1 only

LineAmount
IT hardware — workstations, networking, local-AI inference where useful£9,000
Initial Cyber Essentials Plus certification£2,500
CIC formation, legal, contracting templates£3,500
Total setup£15,000

Reserve fund

The reserve is the largest single allocation in the seed. It is held on the balance sheet, is not used for routine operating costs, and is drawn on only when an existing client’s support commitment requires it and operating cashflow cannot cover the cost. It allows us to meet support commitments already made during a quarter with little new work.

Reserve target: enough to meet the active support commitments for all current engagements for at least twelve months. In Year 1, with few clients, the seed allocation covers this. Once the CIC is self-sustaining (planned from late 2028), the reserve is topped up from operating margin and kept at a level matched to the number of active engagements.

Steady state: Phase Two operating breakdown

No further funding round is planned for Phase Two; costs are covered by project income. The indicative steady-state operating budget assumes the three directors at full-time and an associate base that varies with project demand:

LineAnnual (steady)Notes
Three directors at full-time, plus employer NI and pension£240,000~£75–85k each loaded with NI and pension. Below market rates.
Associate engagements£80,000–£200,000Varies with project work and revenue; associates are not employees.
Premises and operational base£10,000Slightly larger footprint as the team grows.
Insurance — PI, public liability, employer’s£9,000Higher PI cover for larger engagements.
Tooling, software, hosting, infrastructure£10,000Agentic development tool subscriptions are the largest item.
Accountancy, legal, governance, CIC reporting£10,000Audit, annual return, governance support.
Certifications — CE+, ISO 27001 path£8,000ISO 27001 target Phase Two milestone.
Business development£5,000Kept low, as in Year 1.
Capability development£15,000Tooling investment, conferences, training.
Steady-state operating£385,000–£505,000The range comes from associate spend.

Revenue requirement

At cost-plus pricing with a modest operating margin (~25%), the project revenue needed to cover steady-state operating cost and replenish the reserve is in the region of £480,000–£630,000 per year. Translated into engagement counts at a mid-band weighted average of around £60–80k per engagement, that is roughly six to ten medium engagements per year, or the equivalent mix of small and medium engagements totalling that range.

The revenue estimate depends mainly on the average engagement value. If most engagements are small (1–4 day projects at £1–4k each), many more are needed to reach the same revenue. If most are in the largest (“meaty”) band, fewer engagements are needed, but each one adds a larger support commitment against the reserve.

Sensitivity scenarios

Lean

Quiet pipeline year

Project revenue ~£250k. Three or four engagements, mostly small or platform. Directors work fewer hours; little associate work.

Operating cost ~£320k. Operating loss ~£70k.

The loss is covered from contingency and from margin retained in earlier years. Reserve untouched: support commitments to existing clients remain funded.

Standard

Expected steady year

Project revenue ~£480k. Six to seven medium engagements plus a handful of small. Directors at full-time, associate base flexed up.

Operating cost ~£420k. Operating margin ~£60k.

The reserve stays at target, with some spending on capability development.

Strong

Strong pipeline year

Project revenue ~£630k. Eight to ten engagements across the size mix.

Operating cost ~£500k. Operating margin ~£130k.

The reserve is topped up above target. The surplus pays for capability development and could fund early work on a Phase Three, if one is planned.

The lean-year scenario tests whether the model can absorb a year with little work. In that scenario the loss is covered without drawing on the reserve, so support for existing clients remains funded.

Working assumptions

Costs and rates

Capacity and pace

Governance and structural

Open questions and uncertainty

The figures above are working estimates. Each item below could change them significantly.

Relationship to other documents